โšก POWERPLAY
/ Akshaya Villa 101
0
Notifications
No notifications yet.
โ— LIVE
R

Ram K

๐Ÿ‘‘ Admin / Owner
TEAM & ACCESS
๐Ÿ‘ฅ
Team Management
Admin โ€บ
SYSTEM & TOOLS
๐Ÿ“‘
Today's DPR Summary
โ€บ
๐Ÿข
Suppliers & Contractors
โ€บ
Field Connection: Online (Connected)
0 Actions Queued Last synced: Just now
PIPELINE TRACKER โ— Active
1 Analysis & WBS
2 Backend API
3 4 Core Modules
4 52+ Vendors
5 Ready
STAGE COUNTDOWN 4 Core Modules
00:04:45 Estimated Stage Remaining
SYSTEM EXECUTION LOGS โ— 5s LIVE
[23:18:22] Initialized SQLite database engine with 52 vendors.
[23:19:10] Express REST API online on port 3000.
[23:19:35] Active Project: Akshaya Villa 101 loaded.
๐Ÿ”
๐Ÿ”ด HIGH PRIORITY

Akshaya Villa 101

๐Ÿ“ Whitefield, Bangalore

๐Ÿ‘ท

Assigned Site Engineers

0
Loading assigned engineers...
๐Ÿ“ฆ

MATERIAL

โž”
๐Ÿ‘ท

LABOUR

โž”
๐Ÿ“

FILE

โž”

Materials & Deliveries

Track inward materials, photos, and delivery quantities for this project.

Date Material & Category Supplier / Vendor Quantity Rate Total Amount Bill / Photo Received By Action
Date Task / Milestone Material & Category Quantity Consumed Consumed By Notes / Mix Ratio Action
Material Requested Quantity Needed Required By Date Priority Requested By Status Notes 1-Click Dispatch & Actions
Material Item Category Total Inward Received Consumed on Tasks Current Available Stock Stock Health Avg Rate Cumulative Spent Action
Date Type Material & Category Quantity Party / Task Reference Rate / Spend Logged By Notes
Voucher # & Date Supplier / Contractor Charged Site / Project Payment Mode Ref / UTR / Cheque # Amount Paid Authorized / Paid By Actions

Tasks

โ— 0 In Progress โ— 0 Delayed โ— 0 To Do โ— 0 Done
0 0%

๐Ÿ“‘ Daily Progress Report (DPR)

Auto-compiled daily site progress report ready for WhatsApp and PDF print export.

โšก POWERPLAY OFFICIAL DAILY PROGRESS REPORT (DPR)
Project: Akshaya Villa 101
Date: 16-Aug-2026
Prepared By: Suresh Patil (Site Engineer)
Weather: Sunny / 28ยฐC

1. Site Executive Summary

2. Labor & Manpower Deployed (0 Workers)

3. Work Tasks Executed Today

4. Materials Received on Site

5. BOM Materials Consumed on Tasks

6. Key Site Photos Today

๐Ÿ“‡ Master Suppliers, Subcontractors & CRM Directory (56+ Vendors)

Directory with 1-Click Direct Calling, Instant WhatsApp Coordination, Financial Ledger & Payment Vouchers.

๐Ÿข
Total Verified Vendors 56 Across 14 Trade Specialities
๐Ÿ“‘
Total Cumulative Billed โ‚น0 All Inward Invoices
๐Ÿ’ณ
Total Payments Disbursed โ‚น0 All Vouchers Settled
โš ๏ธ
Net Outstanding Liabilities โ‚น0 Pending Vendor Clearances

๐Ÿ‘ท Daily Labor Attendance

Log worker headcounts and view attendance records sorted newest first.

๐Ÿ‘ฅ
Today's Total Headcount 0 Workers across active trades
๐Ÿ”จ
Active Trades On-Site 0 Trade teams deployed
โฑ๏ธ
Today's Overtime Hours 0 hrs Approved field overtime
๐Ÿ’ฐ
Today's Labor Wage Cost โ‚น0 Regular + Overtime
๐Ÿ“Š
Cumulative Site Labor Spend โ‚น0 0 Days Worked
Attendance Records: 0 Entries
Total Workers: 0
Date Worker / Trade Name Number of Workers Actions

๐Ÿ” Quality Inspection & Punch List (Snags)

Identify, record, and track construction defects with floor/room location, photos, 1-click status transitions (Open → Resolved → Verified), and audit timestamp logs.

๐Ÿ“‹
Total Snags Logged 0 All active & resolved items
๐Ÿšจ
Critical Issues (Open) 0 Urgent Rectification
โš ๏ธ
Major Defects (Open) 0 Functional / MEP Defects
๐Ÿ› ๏ธ
Resolved (Pending Signoff) 0 Ready for Engineer Check
โœ…
Verified & Closed 0 Handover Ready

๐Ÿ“ Project Files, Photos & Documents

Site media timeline, architectural drawings, material invoices, delivery challans, and quotations.

More

Suppliers, project tools, settings, and advanced options

People
๐Ÿข
Suppliers & Contractors 56+ directory vendors, running statements & WhatsApp
โ€บ
Project Tools
โš ๏ธ
Issues & Quality Defect tracking with Open, Resolved, and Verified lifecycle
โ€บ
๐Ÿ“‘
Today's Site Summary Daily progress compilation & 1-tap WhatsApp report
โ€บ
System
๐Ÿ‘ค
Logged in as Ram Role: Project Owner / Administrator
Active
โ˜€๏ธ
Theme Sunlight (Light Theme) โ€” Tap to switch
โ€บ
Advanced
๐Ÿ‘ท
Labour Attendance 9 trade headcount steppers & crew muster
โ€บ

๐Ÿšš Receive Material / Log Delivery

Bill Preview

๐Ÿ“ Create Material Indent (Site Request)

๐Ÿ“ธ Upload Site Progress Photo

Photo Preview

๐Ÿ“‹ Create New Construction Task

๐Ÿ“‹ Task Details & Progress

0%
Task Photo Proof
REMARKS HISTORY

๐Ÿ‘ท Record Labor

๐Ÿ‘ฅ Multi-Team Batch Labor Entry & Muster Roll

MULTI-CREW BATCH
1-Click Team Presets:
Trade Category Contractor Team Headcount Daily Rate (โ‚น) Overtime (OT) Subtotal (โ‚น) Action
3 Team Rows Configured
TOTAL WORKERS 0
TOTAL OT HOURS 0 hrs
REGULAR SHIFT COST โ‚น0
OVERTIME COST โ‚น0
AGGREGATE DAILY WAGE โ‚น0
โšก Instant muster sync to daily reports & cost logs

๐Ÿ‘ท Register Site Worker Profile

๐Ÿ“ฒ Contractor Crew WhatsApp Attendance Memo

Send official daily muster attendance memo directly to the crew leader or subcontractor on WhatsApp.

๐Ÿ—๏ธ Add New Villa / Site Project

๐Ÿ”จ Record Material Consumption against Task

๐Ÿ“ฆ
Current Site Stock Available: 0 units
โš ๏ธ Quantity exceeds current available stock!

๐Ÿ“ฒ Dispatch DPR via WhatsApp

Send official daily progress report directly to client, structural consultant, or site team group with 1-click.

๐Ÿ“ฆ Dispatch Material Purchase Order to Supplier

๐Ÿ“ข Broadcast Milestone or Site Alert

๐Ÿ“‡ Register New Supplier or Subcontractor

๐Ÿ’ณ Record Supplier Payment Voucher

๐Ÿ’ฐ
Current Outstanding Balance: โ‚น0

๐Ÿ“‘ Supplier Financial Ledger

VERIFIED

UltraTech Cement Depot

๐Ÿ‘ค Ramesh Gupta โ€ข ๐Ÿ“ž +91 98200 11221 โ€ข ๐Ÿ›๏ธ GST: 29AAACU0123M1Z5
๐Ÿ“ Plot 12, Ind Area, Bangalore
TOTAL BILLED โ‚น0
TOTAL PAID โ‚น0
OUTSTANDING โ‚น0
Date Type Ref / Voucher # Description / Material Site Billed (Debit +) Paid (Credit -) Balance (โ‚น)
๐Ÿ“ž Direct Call ๐Ÿ’ฌ WhatsApp Chat

๐Ÿ’ณ Official Payment Voucher

DISBURSED / SETTLED

๐Ÿ” Report Quality Defect / Snag

Defect Photo Preview ๐Ÿ“ท Live Photo Preview

๐Ÿ–ฅ๏ธ Live Diagnostics & Execution Logs

๐ŸŸข 5s Auto-Poll Active
Total Logs 0
SUCCESS 0
INFO 0
WARN 0
ERROR 0
Live terminal auto-polls every 5 seconds.
Structure Photo 1 of 5
๐Ÿ” Full-Res
Full Screen Photo

๐Ÿงพ Scan & Upload Bill

Auto-Extracted

Snap a photo or upload an Invoice, Delivery Challan, or Material Receipt for instant automated AI data extraction & catalog matching.

ORIGINAL DOCUMENT Details Verified
Document Preview
๐Ÿ“„ Verify extracted fields below and tap Confirm to save.
EXTRACTED DATA (VERIFY & CONFIRM) Editable before saving
Total Amount: โ‚น44,400

๐Ÿ“„ Upload Project Document

โšก

POWERPLAY FIELDAPP

Enterprise Construction Project Control

๐Ÿ”’ Single Sign-On. Site accounts are managed by your administrator.

๐Ÿ‘ฅ Manage Site Engineers & Field Team

โž• Create New Site Engineer Account

Note: Optional. You can assign zero, one, or multiple projects to this engineer.

Active Site Engineers (0)

๐Ÿ‘ท

Manage Site Assignments

Select sites this engineer is authorized to access

Total Sites
0
Assigned Sites
0
Unassigned Sites
0
๐Ÿ”
โœ“

Assigned Sites (0)

Active Access
+

Unassigned Sites (0)

No Access
Changes take effect immediately upon saving.
๐Ÿ‘ท

Assign Site Engineers

Select engineers to assign to this project

๐Ÿ”

๐Ÿ“ฆ Edit Material Delivery

๐Ÿ‘ท Edit Labour Attendance

โšก POWERPLAY
My Project: Akshaya Villa 101
๐Ÿ‘ท Suresh Logout

Today's Assigned Work

3 Tasks

Submitted Today

Today

๐Ÿ“ฆ Material Received

๐Ÿ“ธ Take Site Photo

๐ŸŽจ Theme & Appearance Studio

โšก Industrial Gold

Safety amber & charcoal slate

๐Ÿ”ท Blueprint Navy

Architectural cobalt & navy

๐ŸŒฒ Nordic Concrete

Monochrome & emerald

๐Ÿงฑ Terracotta Civil

Warm clay & burnt earth

๐ŸŒ™ Midnight Dark Ops (OLED)

True dark mode for night shifts & high-sun legibility

Team Member Tasks